Halfords

We have completed the installation of 120 mezzanine floors for this leading High Street retailer.

MH has been a supplier to Halfords for over 20 years.

Our long-term relationship is founded on our commitment to client satisfaction. Halfords turned to us as we are experts in the design, supply and installation of mezzanine flooring.

With so many busy retail environment we ensured that we were availably to work out-of-hours to ensure that Halfords and its many customers suffered minimum disruption while we provided these practical and aesthetically pleasing store expansion solutions.

Steve Marson, Halfords Retail Operations Manager says “Recently we have entered into a large programme of installation of Mezzanine floors, which were supplied and fitted by the MH Group, in a very short lead-time, to a very high standard. Halfords have a long history of working with the MH Group and are very happy with the level of service provided, the quality of workmanship and the cost of the many products that we procure from them.”

SCS

MH Group has recently manufactured & installed a Retail Mezzanine for leading furniture retailer SCS at their new Ipswich store.

Set over 4 different levels, the mezzanine structure incorporates five feature staircases with Stainless Steel & glass handrail, plus one DDA compliant escape stair.

Designed and manufactured in-house in less than 4 weeks, the installation was completed on time, and on budget.

Wembley

Wembley opens on time! on budget!

Not the stadium, but the retail and leisure park adjoining the main complex.

MH Group manufactured & installed Mezzanine Floors to both Allied Carpets, and Halfords retail sites.

In addition, we designed, manufactured and installed steel & glass canopies, and stainless steel balustrading to the adjacent restaurants.

New Look

These photographs illustrate one of several contracts recently carried out for the expanding clothes retailer New Look.

This striking staircase incorporated structural glass, and mirror finished stainless steel surfaces, combined with sweeping curves and 4 changes of level. All completed to a tight schedule for Christmas opening.

AARHUS

The Narrow aisle racking layout designed, supplied and installed for this edible oil processor accommodates over 4000 pallet locations.

Heron Frozen Foods

The racking project, which took 5 months to complete involved stripping out all of the existing racking systems and replacing them with a bespoke system – no small feat considering the building totals 8,000 square meters.